Consultancies & Training Courses

  • Scholz (2021), Workshop on “Wetland Systems and Sustainable Water Resources”. The South African Institution of Civil Engineering (SAICE). 17 participants, Johannesburg, South Africa. Fee of SEK 6,737.
  • Scholz (2020), Workshop on “Wetland Systems and Sustainable Water Resources”. The South African Institution of Civil Engineering (SAICE). 17 participants, Johannesburg, South Africa. Fee of SEK 6,566.
  • Scholz (2019), Teaching Services. University of Electronic Science and Technology of China, Chengdu, China, SEK 53,000.
  • Scholz M. (2019). Project “Water is Attracted to Water”, which is led by the UK theatre maker and researcher Dr Kate Adams. Arts Council England. Consultancy fee of £2,000.
  • Scholz (2018), Teaching Services. 2018 The International Training Course on Engineered Treatment Wetland & Polluted Soil Remediation, Zhangzhou University, Zhangzhou, China. EURO 2,000.
  • Scholz (2018), Teaching Services. University of Electronic Science and Technology of China, Chengdu, China, SEK 53,100.
  • Scholz (2017), Teaching Services. University of Electronic Science and Technology of China, Chengdu, China, SEK 49,735.
  • Scholz (2016), Teaching Services. University of Electronic Science and Technology of China, Chengdu, China, £2,200.
  • Scholz (2015), Teaching Services. University of Electronic Science and Technology of China, Chengdu, China, £1,100.
  • Scholz (2015), Pre-editing Services of Journal Articles. Bosen Academic Conference Solutions Co. Limited, Wuhan, China, £400.
  • Scholz (2015), Pre-editing Services of Journal Articles. Bosen Academic Conference Solutions Co. Limited, Wuhan, China, £600.
  • Scholz (2015), Assessment of Hanbury Hall Proposed Sanitation System. Bear Valley Ventures Limited, Cotebrook, Tarporley, Cheshire, £2,040.
  • Scholz (2015), Scientific Article Editing Service. COMSATS Institute of Information Technology, Islamabad, £700.
  • Scholz (2014), Brief Literature Review on Porous Surfacing. Marshalls, approximately £2,400.
  • Scholz (2014), Assessment of an Integrated Constructed Wetland Design Proposal. Enfield Council, approximately £1,500.
  • Scholz (2013), Assessment of the Product Capacity Down Pipe. Watering Pipe, approximately £4,300.
  • Scholz (2013), Proof of Concept Proposal on Fire Water Runoff Management for the Greater Manchester Fire and Rescue Service, Greater Manchester Fire and Rescue Service, approximately £6,050.
  • Scholz (2013), Review of the Research Excellence Framework Unit of Assessment 14 submission by the Department of Civil Engineering at the University of Greenwich (Part B), University of Greenwich, £150.
  • Scholz (2013), Review of the Research Excellence Framework Unit of Assessment 14 submission by the Department of Civil Engineering at the University of Greenwich (Part A), University of Greenwich, £1,500.
  • Scholz M. (2012-2013), The role of natural, restored and managed/constructed wetlands in mitigating the impacts of rural pollution upon water quality. Systematic review, Department for Environment, Food and Rural Affairs (Defra) and the Centre for Ecology and Hydrology (CEH), approximately £4,000.
  • Scholz M. (2011), Assessment of the document “Finnart Petroleum Treatment Wetland: Detailed Concept Design, Ineos Manufacturing, Grangemouth Projects, £10,000.
  • Scholz M. (2010), Assessment of the United Nations Environment Programme KNOwledge from Science to SOcietieS (KNOSSOS) project outcomes, United Nations, £3,844.
  • Scholz M. (2010), Assessment of River Water Treatment with Moringa oleifera in China (First Phase), Weitex Company (Taiwan), £830.
  • Scholz M. (2010), Wetland System Assessment, Ove Arup and Walsh Water, approximately £1,200.
  • Scholz M. (2008), Wetland Assessment, Environmental Reclamation Services Ltd., £350.
  • Scholz M. (2007), Glaslough Sewerage Scheme: Briefing for Sampling the Integrated Constructed Wetland System, Monaghan County Council (Ireland), £1,645.
  • Carty A. H., Scholz M., Heal K, Keohane J. and Dunne E. (2007), Constructed Farm Wetlands: Design Manual for Scotland and Northern Ireland, Scottish Environment Protection Agency and the Northern Ireland Department of Environment, Tender Reference No. S/15059/06, £21,825.
  • Scholz M. (2006), Integrated Constructed Wetlands for the Removal of Phosphorus, Irish Government Department of Environment, Heritage and Local Government, £8,123.
  • Scholz M. (2006), Integrated Constructed Wetlands Initiative, Irish Government Department of Environment, Heritage and Local Government, £822.
  • Scholz M. (2005), Ruchill Surface Water Management Project, sub-contracted by Atkins Consultants, Glasgow City Council, £700.
  • Cunningham C., Heal K. V. and Scholz M. (2004-2005), Treatment of Gully Pot Effluent (Detailed Design), Caerphilly Council, £4,500.
  • Scholz M. (2004-2005), Investigation of the Capillary Suction Time, Triton Electronics, approximately £5,000.
  • Cunningham C., Heal K. V. and Scholz M. (2004-2005), Treatment of Gully Pot Effluent (Outline Design), Vale of Glamorgan Authority, £6,500.
  • Heal K. V. and Scholz M. (2003-2004), Caw Burn Wetland and Catchment Improvements (Stage I), Scottish Environment Protection Agency, £5,000.
  • Scholz M. (2003-2004), Experimental Design and Operation of a Small-scale Storm Water Storage and Treatment System, Atlantis Storm Water Management, £4,000.
  • Scholz M. (2003), Preliminary Wetland Design Recommendations, Bluewater Flatfish Farms and Solanda Agriculture UK, £600.
  • Scholz (2000), Water and soil quality assessment, private household in Bradford, £300.